This Grade II listed building was in need of some care and attention and in 2020 CMJ refurbished the bar and backfitting.
The original oak panelling to the bar front was retained and fitted to the new counter, but painted a dark blue in contrast to the rest of the existing panelling, a new backfitting was installed exposing the existing windows. A lovely project full of character.
The Eagle at Barrow CMJ manufactured and supplied all the furniture and fixed seating to the Eagle at Barrow and cladded the bar front to specification.
Dockers Bar, Fleetwood Full room interior design, new ceiling, new lighting, supply and fit of new flooring and furniture, re cladding of the existing bar. After
The Bellfry Hotel Spa “CMJ refurbished our spa and leisure facilities over a six month period during 2011. The work was done in phases at all hours to suit our business needs allowing us to remain open whilst works continued. They re-tiled all the public areas within the spa, including the steam rooms, showers, pool … Continue reading The Belfry Hotel Spa